Volume & Issue: Volume 3, Issue 1, Winter 2014, Pages 1-66 
1. Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Pages 5-16

Abolfazl Adressi; Reza Bashirzadeh; Vahid Azizi; Saeed Tasouji Hassanpour


3. Machinability Investigation of Inconel 657 in High-speed Turning

Pages 27-34

Amir Hossein Khoei; Hasan Fathi; Masoud Farahnakian; Mohammad Reza Razfar